Buyer guide · Finishing

How should magnets be specified in packaging?

Approve magnet polarity, pull force, concealment, spacing, adhesive and closure feel in a fully assembled production-representative sample.

Submit project requirements
Packaging procurement and production reference for how should magnets be specified in packaging

Checklist

Finish details to put in the specification

  • Magnet performance
  • Adhesive compatibility
  • Assembly method
  • Proof purpose
  • Target quantity and SKU allocation
  • Approval sample and decision owner
  • Required date and Mainland China delivery point
  • Change and repeat-order record

Process evaluation

Four controls behind a repeatable finish

01

Magnet performance

Specify magnet size, polarity, pull force, concealment, safe spacing and closure feel after the box is fully assembled.

02

Adhesive compatibility

Match adhesive to surface energy, coating, temperature, load and ageing; initial tack alone does not prove long-term performance.

03

Assembly method

Document folding sequence, glue position, jigs, manual steps and workmanship standards so output is repeatable.

04

Proof purpose

State whether the proof approves structure, layout, colour direction, material or finished process because one proof rarely confirms everything.

Execution method

Four actions from RFQ to production

Mark a separate finish layer

Use named vector layers for foil, varnish, emboss, cut and other process areas.

Approve on the real substrate

Colour, gloss, relief and adhesion must be checked on the intended material.

Set visible tolerances

Define registration, edges, pinholes, scratches, wrinkles and acceptable variation.

Retain production references

Keep approved samples, process settings and supplier references for repeat orders.

FAQ

Questions buyers often ask

How should magnets be specified in packaging?

Approve magnet polarity, pull force, concealment, spacing, adhesive and closure feel in a fully assembled production-representative sample.

What should be written in the specification?

At minimum, define Magnet performance, Adhesive compatibility, Assembly method, Proof purpose, then link quantity, sample, timing, inspection and the approved revision.

Is a physical sample needed?

A decision involving structure, material, colour, finish, assembly or use performance normally needs a physical sample matched to that question; a screen proof cannot approve everything.

Can the previous standard be reused for a repeat order?

Reuse a controlled standard only when files, material, structure, supply chain and use conditions remain unchanged. Record every change and decide whether resampling or reapproval is required.

Submit an executable packaging brief

Share the product, dimensions, quantity, material, finish, date and delivery city

Submit project requirements