Buyer guide · Finishing
How should die-cutting tolerance be specified?
Set separate tolerances for cut position, crease, perforation, nick, stripping and print registration based on the material and assembly function.
Submit project requirements
Checklist
Finish details to put in the specification
- Die-cut tolerance
- Tolerance stack-up
- Finished dimensions
- Assembly method
- Target quantity and SKU allocation
- Approval sample and decision owner
- Required date and Mainland China delivery point
- Change and repeat-order record
Process evaluation
Four controls behind a repeatable finish
Die-cut tolerance
Set measurable cut, crease, nick, stripping and registration tolerances based on structure, material and assembly needs.
Tolerance stack-up
Review how material, printing, die cutting, gluing and packed-product variation combine at final assembly.
Finished dimensions
Record internal and external size, measuring method and acceptable tolerance instead of relying on a photo or nominal size alone.
Assembly method
Document folding sequence, glue position, jigs, manual steps and workmanship standards so output is repeatable.
Execution method
Four actions from RFQ to production
Mark a separate finish layer
Use named vector layers for foil, varnish, emboss, cut and other process areas.
Approve on the real substrate
Colour, gloss, relief and adhesion must be checked on the intended material.
Set visible tolerances
Define registration, edges, pinholes, scratches, wrinkles and acceptable variation.
Retain production references
Keep approved samples, process settings and supplier references for repeat orders.
FAQ
Questions buyers often ask
How should die-cutting tolerance be specified?
Set separate tolerances for cut position, crease, perforation, nick, stripping and print registration based on the material and assembly function.
What should be written in the specification?
At minimum, define Die-cut tolerance, Tolerance stack-up, Finished dimensions, Assembly method, then link quantity, sample, timing, inspection and the approved revision.
Is a physical sample needed?
A decision involving structure, material, colour, finish, assembly or use performance normally needs a physical sample matched to that question; a screen proof cannot approve everything.
Can the previous standard be reused for a repeat order?
Reuse a controlled standard only when files, material, structure, supply chain and use conditions remain unchanged. Record every change and decide whether resampling or reapproval is required.
Continue building the procurement specification