Buyer guide · Quality

How should the first packaging article be approved?

First-article approval compares the initial production output with released files, specification and approved sample before the run continues.

Submit project requirements
Packaging procurement and production reference for how should the first packaging article be approved

Checklist

Quality evidence to define before production

  • Approved reference
  • Finished dimensions
  • Colour target
  • Inspection plan
  • Target quantity and SKU allocation
  • Approval sample and decision owner
  • Required date and Mainland China delivery point
  • Change and repeat-order record

Quality control

Four elements of an auditable inspection plan

01

Approved reference

Seal, date and identify the approved sample with linked files and limits; keep reference ownership and storage controlled.

02

Finished dimensions

Record internal and external size, measuring method and acceptable tolerance instead of relying on a photo or nominal size alone.

03

Colour target

Use an approved physical reference, Pantone target or measurable tolerance and define the viewing condition for approval.

04

Inspection plan

Define checkpoints, sample size, measurement tools, defect photos and release authority before production starts.

Execution method

Four actions from RFQ to production

Translate expectations into criteria

Use dimensions, tolerances, test methods and defect photographs.

Inspect at the right stages

Place controls at incoming material, first article, in-process and final release as risk requires.

Record traceable results

Identify lot, SKU, sample size, inspector, tools, findings and disposition.

Close corrective actions

Contain affected stock, verify root cause and confirm the fix before repeat release.

FAQ

Questions buyers often ask

How should the first packaging article be approved?

First-article approval compares the initial production output with released files, specification and approved sample before the run continues.

What should be written in the specification?

At minimum, define Approved reference, Finished dimensions, Colour target, Inspection plan, then link quantity, sample, timing, inspection and the approved revision.

Is a physical sample needed?

A decision involving structure, material, colour, finish, assembly or use performance normally needs a physical sample matched to that question; a screen proof cannot approve everything.

Can the previous standard be reused for a repeat order?

Reuse a controlled standard only when files, material, structure, supply chain and use conditions remain unchanged. Record every change and decide whether resampling or reapproval is required.

Submit an executable packaging brief

Share the product, dimensions, quantity, material, finish, date and delivery city

Submit project requirements